CIVIL CONSTRUCTION ESTIMATE FORMAT FOR 20 ROOMS ALLAPUZHA RESORT |
GROUND FLOOR |
|
|
S NO |
Description |
Quantity |
Unit |
RATE |
AMOUNT |
| |
|
|
|
|
|
1 |
Site clearing & leveling |
LS |
|
|
|
2 |
Sand filling(river sand 30 cm thick) |
74 |
M2 |
|
|
2a |
Sand piling 3" 0 2m depth |
|
RM |
|
|
3 |
Earth work excavation for foundation |
441 |
M3 |
|
|
| |
trenches in all classes of soil and |
|
|
|
|
| |
depositing on bank with initial lead up to |
|
|
|
|
| |
50 m. and lift up to 1.5 m including |
|
|
|
|
| |
breaking clods, watering ramming and |
|
|
|
|
| |
sectinong of spoil bank etc. complete. |
|
|
|
|
4 |
EARTH FILLING FOUNDATION |
378 |
M3 |
|
|
| |
Filling the foundation trenches with the cut |
|
|
|
|
| |
earth available at site in layers not |
|
|
|
|
| |
exceeding 20 cms in depth consolidating |
|
|
|
|
| |
each deposited layers by ramming and |
|
|
|
|
| |
watering. Measurements will be taken only |
|
|
|
|
| |
the filled and compacted earth. |
|
|
|
|
5 |
P C C 1:4:8 |
24 |
M3 |
|
|
| |
Providing Plain Cement Concrete 1:4:8 |
|
|
|
|
| |
( 1 cement: 4 sand: 8 broken stones) |
|
|
|
|
| |
using 40 mm. nominal size and down grade |
|
|
|
|
| |
hard granite broken stones, including cost |
|
|
|
|
| |
and conveyance of all materilas to site, |
|
|
|
|
| |
labour charges for watering, curing etc. |
|
|
|
|
| |
Complete for flooring. |
|
|
|
|
6 |
FLOORING WITH C C1:4:8 |
757 |
M2 |
|
|
| |
Providing Plain Cement Concrete 1:4:8 |
|
|
|
|
| |
( 1 cement: 4 sand: 8 broken stones) |
|
|
|
|
| |
using 40 mm. nominal size and down grade |
|
|
|
|
| |
hard granite broken stones, including cost |
|
|
|
|
| |
and conveyance of all materilas to site, |
|
|
|
|
| |
labour charges for watering, curing etc. |
|
|
|
|
| |
Complete for flooring. |
|
|
|
|
7 |
RCC FOOTING |
96 |
M3 |
|
|
| |
Providing Reinforced Cement Concrete of |
|
|
|
|
| |
M20 using 20 mm. nominal size and down |
|
|
|
|
| |
grade hard granite broken stones machine |
|
|
|
|
| |
mixed and including cost and conveyance |
|
|
|
|
| |
of all materials to site, labour charges for |
|
|
|
|
| |
formwork, hire charges, watering, curing, |
|
|
|
|
| |
lifting charges etc. complete but excluding |
|
|
|
|
| |
the cost and labour of steel reinforcement |
|
|
|
|
8 |
RCC COLUMNS PEDESTEL |
7 |
M3 |
|
|
| |
Providing Reinforced Cement Concrete of |
|
|
|
|
| |
M20 Columns pedestal using 20mm. |
|
|
|
|
| |
nominal size and down grade hard granite |
|
|
|
|
| |
broken stones including cost and |
|
|
|
|
| |
conveyance of all materials to site, labour |
|
|
|
|
| |
charges for formwork, hire charges, |
|
|
|
|
| |
watering, curing, lifting charges etc. |
|
|
|
|
| |
complete but excluding the cost and labour |
|
|
|
|
| |
of steel reinforcement. |
|
|
|
|
9 |
RCC COLUMNS PLINTH BEAM |
27 |
M3 |
|
|
| |
Providing Reinforced Cement Concrete of |
|
|
|
|
| |
M20 Columns using 20mm. nominal size |
|
|
|
|
| |
and dwon grade hard granite broken stones |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges for |
|
|
|
|
| |
formwork, hire charges, watering, curing, |
|
|
|
|
| |
lifting charges etc. complete but excluding |
|
|
|
|
| |
the cost and labour of steel reinforcement. |
|
|
|
|
10 |
BRICK WORK |
294 |
M3 |
|
|
| |
First class brick work masonry in C. M. |
|
|
|
|
| |
1:6 (1 cement 6 coarse sand) with |
|
|
|
|
| |
approved good quality country burnt bricks |
|
|
|
|
| |
of compressive strength 35 kg/m2 of |
|
|
|
|
| |
standard size of on super structure of all |
|
|
|
|
| |
thickness. The rate shall include cost of all |
|
|
|
|
| |
materials labour and other incidental |
|
|
|
|
| |
charges of all materials to complete the |
|
|
|
|
| |
work |
|
|
|
|
11 |
HALF BRICK WORK: supplying and |
65 |
M2 |
|
|
| |
laying 12 cm thk brick work in CM 1:5 |
|
|
|
|
| |
using good quality country burnt brick |
|
|
|
|
| |
including providing 10 cm thk R. C. C. band |
|
|
|
|
| |
at 1 m interval etc complete. |
|
|
|
|
12 |
RCC COLUMNS: Providing. Reinforced |
15 |
M3 |
|
|
| |
Cement Concrete of M20 column using |
|
|
|
|
| |
20mm. Nominal size and down grade hard |
|
|
|
|
| |
granite broken stones including cost and |
|
|
|
|
| |
conveyance of all materials to site, labour |
|
|
|
|
| |
charges for formwork, hire charges, |
|
|
|
|
| |
watering, curing, lifting charges etc. |
|
|
|
|
|
complete but excluding the cost and labour |
|
|
|
|
| |
of steel reinforcement. |
|
|
|
|
13 |
RCC ROOF SLAB & BEAM M20 |
132 |
M3 |
|
|
| |
Providing .Reinforced Cement Concrete of |
|
|
|
|
| |
M20 slab & beam using 20mm. nominal |
|
|
|
|
| |
size and down grade hard granite broken |
|
|
|
|
| |
stones including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges for |
|
|
|
|
| |
formwork, hire charges, watering, curing, |
|
|
|
|
| |
lifting charges etc. complete but excluding |
|
|
|
|
| |
the cost and labour of steel reinforcement. |
|
|
|
|
14 |
RCC STAIRCASE |
6 |
M3 |
|
|
| |
Providing Reinforced cement Concrete of |
|
|
|
|
| |
M20 using 20mm. nominal size and down |
|
|
|
|
| |
grade hard granite broken stones including |
|
|
|
|
| |
cost and conveyance of all materials to |
|
|
|
|
| |
site, labour charges for formwork, hire |
|
|
|
|
| |
charges, watering, curing, lifting charges |
|
|
|
|
| |
etc. complete but excluding the cost and |
|
|
|
|
| |
labour of steel reinforcement |
|
|
|
|
15 |
RCC THIN SLAB |
23 |
M2 |
|
|
| |
Providing Reinforced cement Concrete of |
|
|
|
|
| |
M20 thin slab using 20mm. nominal size |
|
|
|
|
|
and down grade hard granite broken stones |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges for |
|
|
|
|
| |
formwork, hire charges, watering, curing, |
|
|
|
|
| |
lifting charges etc. complete but excluding |
|
|
|
|
| |
the cost and labour of steel reinforcement. |
|
|
|
|
16 |
RCC SILL BELT |
88 |
M2 |
|
|
| |
Providing Reinforced Cement Concrete of |
|
|
|
|
| |
M20 sillbelt using 20mm. nominal size |
|
|
|
|
|
and down grade hard granite broken stones |
|
|
|
|
| |
machine mixed and mechanically vibrated |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges for |
|
|
|
|
| |
formwork, hire charges, watering, curing, |
|
|
|
|
| |
lifting charges etc. complete but excluding |
|
|
|
|
| |
the cost and labour of steel reinforcement. |
|
|
|
|
17 |
BORDER PLASTERING |
252 |
M |
|
|
| |
Border Plastering with cement mortar to |
|
|
|
|
| |
edges of slabs & sun shades. |
|
|
|
|
18 |
FIBER DOOR |
10 |
|
|
|
| |
Providing and fixing first quality F.R.P |
|
|
|
|
| |
door and shutter with handles, hinges |
|
|
|
|
| |
& Tower bolts including cost of fixing |
|
|
|
|
| |
charge, cost of conveyance, etc. complete |
|
|
|
|
| |
as per standard practice. |
|
|
|
|
19 |
CEILING PLASTERING |
777 |
M2 |
|
|
| |
Plastering with cement mortar to ceilings, |
|
|
|
|
| |
stairs, steps, slabs, and other structural |
|
|
|
|
| |
architectural features at all heights, floated |
|
|
|
|
| |
hard and trowelled get smooth finish. The |
|
|
|
|
| |
rate shall include provision of grooves |
|
|
|
|
| |
scaffolding at any height curing etc. |
|
|
|
|
| |
complete as directed by the Engineer |
|
|
|
|
20 |
WALL PLASTERING |
1673 |
M2 |
|
|
| |
Plastering with cement mortar to walls, |
|
|
|
|
| |
columns and other structural |
|
|
|
|
| |
architectural features at all heights, floated |
|
|
|
|
| |
hard and trowelled get smooth finish. The |
|
|
|
|
| |
rate shall include provision of grooves |
|
|
|
|
| |
scaffolding at any height curing etc. |
|
|
|
|
| |
complete as directed by the Engineer |
|
|
|
|
21 |
STEEL REQUIREMENTS |
29000 |
kg |
|
|
| |
Supplying, cutting, bending and |
|
|
|
|
| |
straightening steel reinforcement Fe-415 |
|
|
|
|
| |
for R.C.C. work; binding with 22 gauge |
|
|
|
|
| |
binding wire etc. complete in all respects |
|
|
|
|
| |
with deformed bars conforming to I.S |
|
|
|
|
| |
1786-1961 or IS 1139 and placing in |
|
|
|
|
| |
position.(basic prize of streel-Rs.45/kg) |
|
|
|
|
22 |
TEAK WOOD DOORS: Providing and |
34 |
M2 |
|
|
| |
fixing best quality well seasoned Teak |
|
|
|
|
| |
wood of frame size 230x80mm., and fully |
|
|
|
|
| |
paneled shutters of doors, having shutter |
|
|
|
|
| |
frame of 150x35 mm for verticals |
|
|
|
|
| |
and horizontals 150 x 35 mm for bottom |
|
|
|
|
| |
and lock rail, 16 mm thick panels cutting |
|
|
|
|
| |
necessary slots to suit shutters, fixing the |
|
|
|
|
| |
frames to masonry with 3 rows M.S. |
|
|
|
|
| |
flatiron clamps mbeded in cement concrete |
|
|
|
|
| |
block of size 30cmx15cm, including |
|
|
|
|
| |
applying two coats of coal tar to the out of |
|
|
|
|
| |
face of frames in contract with masonry or |
|
|
|
|
| |
R.C.C. including cost and conveyance of |
|
|
|
|
| |
all materials to site, labour charges, fixing |
|
|
|
|
| |
charges, inclusive of all other fixtures like |
|
|
|
|
| |
stainless steel hinges, and necessary |
|
|
|
|
| |
stainless steel tower bolts(2 nos. per door) |
|
|
|
|
| |
of good quality and godrej door locks with |
|
|
|
|
| |
handle(cost of door handles and locks not |
|
|
|
|
| |
less than - Rs. 500) etc. |
|
|
|
|
23 |
DOORS: Providing and fixing best |
49 |
M2 |
|
|
| |
quality, well seasoned Anjili/ jack wood of |
|
|
|
|
| |
frame 125 x 65 mm., and fully paneled |
|
|
|
|
| |
shutters of doors, having shutter frame of |
|
|
|
|
| |
150 x 35 mm for verticals and horizontals |
|
|
|
|
| |
150 x 35 mm for bottom and lock rail, 16 |
|
|
|
|
| |
mm thick panels cutting necessary slots to |
|
|
|
|
| |
suit shutters, fixing the frames to masonry |
|
|
|
|
| |
with 3 rows M.S. flatiron clamps |
|
|
|
|
|
embedded in cement concrete block of size |
|
|
|
|
| |
30cmx23cmx15cm, including applying |
|
|
|
|
| |
two coats of coal tar to the out of face of |
|
|
|
|
|
frames in contract with masonry or R.C.C., |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges, fixing |
|
|
|
|
| |
charges, inclusive of all other fixtures like |
|
|
|
|
| |
stainless steel hinges, and necessary |
|
|
|
|
| |
stainless steel tower bolts(2 nos.per door) |
|
|
|
|
| |
of good quality and godrej door locks not |
|
|
|
|
| |
less than - Rs. 500) etc (Refer drawing no |
|
|
|
|
24 |
ANJILY WOOD WINDOWS: Providing |
19 |
M2 |
|
|
| |
and fixing wooden shutters and frames for |
|
|
|
|
| |
windows and ventilators, fully glazed, of |
|
|
|
|
| |
approved sizes and design as per the |
|
|
|
|
| |
drawings, using best quality hard wood |
|
|
|
|
| |
like Teakwood frames and shutters |
|
|
|
|
| |
providing grooves in shutter frame to suit |
|
|
|
|
| |
shutters, side frames to be clamped onto |
|
|
|
|
| |
the walls 2 nos.iron clamps screwed and |
|
|
|
|
|
fitted on each sides and embedded in cement |
|
|
|
|
| |
concrete blocks of size 30x23x15 cms. |
|
|
|
|
| |
Shutter fixing to the frames by using |
|
|
|
|
| |
necessary accessories, including applying a |
|
|
|
|
| |
coat of wood primer, fixing the shutter to |
|
|
|
|
| |
pinhead glass of 4mm thick, providing |
|
|
|
|
| |
grills for windows as per architects design |
|
|
|
|
| |
and painting the grills using synthetic |
|
|
|
|
| |
enamel paint of approved colour two coats |
|
|
|
|
| |
over a coat of primer after proper treatment |
|
|
|
|
| |
of the surface as per standard practice |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges, labour |
|
|
|
|
| |
charges for fitting, all necessary fixtures |
|
|
|
|
| |
likestrain less steel hinges, tower bolts, |
|
|
|
|
| |
adjustable wind appliances, locking system |
|
|
|
|
| |
etc. complete |
|
|
|
|
25 |
FLOOR FINISHING GRANITE SLAB: |
572 |
M2 |
|
|
| |
Supplying and Laying Granite Slabs over |
|
|
|
|
| |
grey cement mortar to perfect line and |
|
|
|
|
| |
level as per standard practice including |
|
|
|
|
| |
cost of conveyance of materials to site, lead |
|
|
|
|
| |
and lift cleaning and polishing the slabs to |
|
|
|
|
| |
perfect finish after laying etc. |
|
|
|
|
| |
complete. (Basic prize of granite slab |
|
|
|
|
| |
190/sq.feet) |
|
|
|
|
26 |
FLOORING WITH VITRIFIED TILE |
168 |
M2 |
|
|
| |
Flooring with Virtified tiles laid in 12mm |
|
|
|
|
| |
thick cement 1:3 one coat and pointing |
|
|
|
|
| |
with coloured cement to mortar the tiles |
|
|
|
|
| |
including cost of materials labour charge |
|
|
|
|
| |
etc. complete for all levels. |
|
|
|
|
27 |
FLOOR FINISHING CERAMIC TILES |
38 |
M2 |
|
|
| |
Flooring with ceramic tiles laid in 12mm |
|
|
|
|
| |
thick cement 1:3 one coat and pointing |
|
|
|
|
| |
with water proof joint fillers (Bal Endura |
|
|
|
|
| |
Laticrete) coloured cement to mortar tiles |
|
|
|
|
| |
including cost of materials labour charge |
|
|
|
|
| |
etc. complete for all levels. (basic prize of |
|
|
|
|
| |
tile-Rs30/sq.ft |
|
|
|
|
28 |
Dadooing the walls of 210 cms. Height |
125 |
M2 |
|
|
| |
using glazed tile of first quality, fixing the |
|
|
|
|
| |
tiles after applying a coat of cement mortar |
|
|
|
|
| |
1:3 (1 cement: 3 sand) with a minimum of |
|
|
|
|
| |
9 mm. thick and fixing the tile with the |
|
|
|
|
| |
water proofing tile adhesive Balendura |
|
|
|
|
| |
Catirete and filling the tile joints with |
|
|
|
|
| |
cement of matching colour including cost |
|
|
|
|
| |
and conveyance of all materials to site, |
|
|
|
|
| |
labour charges, extra charges for |
|
|
|
|
| |
chamfering the edges, etc. complete for |
|
|
|
|
29 |
STEP FLOOR FINISHING TILES |
6 |
M2 |
|
|
| |
(Designer Cement Coloured Tile) Flooring |
|
|
|
|
| |
with cement tile laid in 25mm thick cement |
|
|
|
|
| |
1:3 one coat and pointing with water proof |
|
|
|
|
| |
joint fillers coloured cement to mortar tiles |
|
|
|
|
| |
including cost of materials labour charge |
|
|
|
|
| |
etc. complete for all levels. (basic prize of |
|
|
|
|
| |
tile-Rs38/sq.ft |
|
|
|
|
30 |
STAINLESS STEEL HANDRAILS |
101 |
M2 |
|
|
| |
Providing and fixing stainlesssteel |
|
|
|
|
| |
handrails B class (304) grade SS pipe top |
|
|
|
|
| |
rail 2",middle rail 3 nos in 3/4",vertical |
|
|
|
|
| |
member 1.25"at 1.50 M intervals and 90 |
|
|
|
|
| |
cm height using TIG Welding rate |
|
|
|
|
| |
including cost of pipe, welding charges etc |
|
|
|
|
| |
complete |
|
|
|
|
| |
|
|
|
|
|
FIRST FLOOR |
31 |
RCC COLUMNS: Providing. Reinforced |
15 |
M3 |
|
|
| |
Cement Concrete of M20 coloum using |
|
|
|
|
| |
20mm. Nominal size and down grade hard |
|
|
|
|
| |
granite broken stones including coast and |
|
|
|
|
| |
conveyance of all materials to site, labour |
|
|
|
|
| |
charges for formwork, hire charges, |
|
|
|
|
| |
watering, curing, lifting charges etc. |
|
|
|
|
| |
complete but excluding the cost and labour |
|
|
|
|
| |
of steel reinforcement |
|
|
|
|
32 |
BRICK WORK |
234 |
M3 |
|
|
| |
First Class brick work masonry in C.M. |
|
|
|
|
| |
1:6(1 cement 6 coarse sand) with |
|
|
|
|
| |
approved good quality country burnt bricks |
|
|
|
|
| |
of compressive strength 35 kg/m2 of |
|
|
|
|
| |
standard size of on super structure of all |
|
|
|
|
| |
thickness. The rate shall include cost of all |
|
|
|
|
| |
materials labour and other inicdental |
|
|
|
|
| |
charges of all materials to complete the |
|
|
|
|
| |
work |
|
|
|
|
33 |
RCC LINTEL,SHADE & BEAM M20: |
46 |
M3 |
|
|
| |
Providing. Reinforced Cement Concrete of |
|
|
|
|
| |
M20 lintel & beam using 20mm. nominal |
|
|
|
|
| |
size and down grade hard granite broken |
|
|
|
|
| |
stones including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges for |
|
|
|
|
| |
formwork, hire charges, watering, curing, |
|
|
|
|
| |
lifting charges etc. complete but excluding |
|
|
|
|
| |
the cost and labour of steel reinforcement |
|
|
|
|
34 |
RCC SILL BELT |
86 |
M2 |
|
|
| |
Providing Reinforced Cement Concrete of |
|
|
|
|
| |
M20 sillbelt using 20mm. nominal size |
|
|
|
|
| |
and down grade hard granite broken stones |
|
|
|
|
| |
machine mixed and mechanically vibrated |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges for |
|
|
|
|
| |
formwork, hire charges, watering, curing, |
|
|
|
|
| |
lifting charges etc. complete but excluding |
|
|
|
|
| |
the cost and labour of steel reinforcement |
|
|
|
|
35 |
STEEL REQUIREMENTS |
7800 |
kg |
|
|
| |
Supplying, cutting, bending and |
|
|
|
|
| |
straightening steel reinforcement Fe-415 |
|
|
|
|
| |
for R.C.C. work; binding with 22 gauge |
|
|
|
|
| |
binding wire etc. complete in all respects |
|
|
|
|
| |
with deformed bars conforming to I.S |
|
|
|
|
| |
1786-1961 or IS 1139 and placing in |
|
|
|
|
| |
position.(basic prize of streel-Rs.45/kg) |
|
|
|
|
36 |
WALL PLASTERING |
2977 |
M2 |
|
|
| |
Plastering with cement mortar to walls, |
|
|
|
|
| |
columns and other structural architectural |
|
|
|
|
| |
features at all heights, floated hard and |
|
|
|
|
| |
trowelled get smooth finish. The rate shall |
|
|
|
|
| |
include provision of grooves scaffolding at |
|
|
|
|
| |
any height curing etc. complete as directed |
|
|
|
|
| |
by the Engineer. |
|
|
|
|
37 |
DOORS : Providing and fixing best |
104 |
M3 |
|
|
| |
quality, well seasoned Anjili/ jack wood of |
|
|
|
|
| |
frame 125x65mm, and fully paneled |
|
|
|
|
| |
shutters of doors, having shutter frame of |
|
|
|
|
| |
150 x 35 mm for verticals and horizontals |
|
|
|
|
| |
150 x 35 mm for bottom and lock rail, 16 |
|
|
|
|
| |
mm thick panels cutting necessary slots to |
|
|
|
|
| |
suit shutters, fixing the frames to masonry |
|
|
|
|
| |
with 3 rows M.S. flatiron clamps |
|
|
|
|
| |
embedded in cement concrete block of size |
|
|
|
|
| |
30cmx23cmx15cm, including applying |
|
|
|
|
| |
two coats of coal tar to the out of face of |
|
|
|
|
| |
frames in contact with masonry or R.C.C., |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges, fixing |
|
|
|
|
| |
charges, inclusive of all other fixtures like |
|
|
|
|
| |
stainless steel hinges, and necessary |
|
|
|
|
| |
stainless steel tower bolts(2 nos.per door) |
|
|
|
|
| |
of good quality and godrej door locks with |
|
|
|
|
| |
handle(cost of door handles and locks not |
|
|
|
|
| |
less than - Rs.500) etc (Refer drawing no) |
|
|
|
|
38 |
ANJILY WOOD WINDOWS: Providing |
10 |
M3 |
|
|
| |
and fixing wooden shutters and frames for |
|
|
|
|
| |
windows and ventilators, fully glazed, of |
|
|
|
|
| |
approved sizes and design as per the |
|
|
|
|
| |
drawings, using best quality hard wood |
|
|
|
|
| |
like Teakwood frames and shutters |
|
|
|
|
| |
providing grooves in shutter frame to suit |
|
|
|
|
| |
shutters, side frames to be clamped onto |
|
|
|
|
| |
the walls 2 nos.iron clamps screwed and |
|
|
|
|
| |
fitted on each sides and embedded in cement |
|
|
|
|
| |
cocrete blocks of size 30x223x15 cms. |
|
|
|
|
| |
Shutter fixing to the frames by using |
|
|
|
|
| |
necessary accessories, including applying a |
|
|
|
|
| |
coat of wood primer, fixing the shutter to |
|
|
|
|
| |
pinhead glass of 4mm thick, providing |
|
|
|
|
| |
grills for windows as per architects design |
|
|
|
|
| |
and painting the grills using synthetic |
|
|
|
|
| |
enamel paint of approved colour two coats |
|
|
|
|
| |
over a coat of primer after proper treatment |
|
|
|
|
| |
of the surface as per standard practice |
|
|
|
|
| |
including cost and conveyance of all |
|
|
|
|
| |
materials to site, labour charges, labour |
|
|
|
|
| |
charges for fitting, all necessary fixtures |
|
|
|
|
| |
likestrain less steel hinges, tower bolts, |
|
|
|
|
| |
adjustable wind appliances, locking system |
|
|
|
|
| |
etc. complete. |
|
|
|
|
39 |
FLOOR FINISHING CERAMIC TILES |
65 |
M2 |
|
|
| |
Flooring with ceramic tiles laid in 12mm |
|
|
|
|
| |
thick cement 1:3 one coat and pointing |
|
|
|
|
| |
with water proof joint fillers (Bal Endura |
|
|
|
|
| |
Laticrete) coloured cement to mortar tiles |
|
|
|
|
| |
including cost of materials labour charge |
|
|
|
|
| |
etc. complete for all levels. (basic prize of |
|
|
|
|
| |
tile-Rs30/sq.ft |
|
|
|
|
40 |
Dadooing the walls of 210 cms. Height |
219 |
M2 |
|
|
| |
using glazed tile of first quality, fixing the |
|
|
|
|
| |
tiles after applying a coat of cement mortar |
|
|
|
|
| |
1:3 ( cement : 3 sand) with a minimum of |
|
|
|
|
| |
9 mm. thick and fixing the tile with the |
|
|
|
|
| |
water proofing tile adhesive Balendura |
|
|
|
|
| |
Catirete and filling the tile joints with |
|
|
|
|
| |
cement of matching colour including cost |
|
|
|
|
| |
and conveyance of all materials to site, |
|
|
|
|
| |
labour charges, extra charges for |
|
|
|
|
| |
chamfering the edges, etc. complete for |
|
|
|
|
41 |
FLOOR WITH VITRIFIED TILE |
541 |
M2 |
|
|
| |
Flooring with Vitrified tiles laid in 12mm |
|
|
|
|
| |
thick cement 1:3 one coat and pointing |
|
|
|
|
| |
with coloured cement to mortar the tiles |
|
|
|
|
| |
including cost of materials labour charge |
|
|
|
|
| |
etc. complete for all levels. |
|
|
|
|
42 |
FLOOR FINISHING GRANITE SLAB: |
120 |
M2 |
|
|
| |
Supplying and Laying Granite Slabs over |
|
|
|
|
| |
grey cement mortar to perfect line and |
|
|
|
|
| |
level as per standard practice including |
|
|
|
|
| |
cost and conveyance of all materials to |
|
|
|
|
| |
site, lead and lift cleaning and polishing the |
|
|
|
|
| |
slabs to perfect finish after laying etc. |
|
|
|
|
| |
complete. (Basic prize of granite slab |
|
|
|
|
| |
190/sq.feet) |
|
|
|
|
43 |
PROVIDING STEEL TRUSS WORK |
846 |
M2 |
|
|
| |
FOR ROOFING : providing steel truss |
|
|
|
|
| |
work for roofing using 3"x1.5: m.s square |
|
|
|
|
| |
sections as rafters and 2" x 1" m.s pipe |
|
|
|
|
| |
sections as battens on top at 1' intervals |
|
|
|
|
| |
for laying roofing tile, welded to perfect finish |
|
|
|
|
| |
line and level as per standard practice etc |
|
|
|
|
| |
complete |
|
|
|
|
44 |
FIBER DOOR |
16 |
no |
|
|
| |
Providing and fixing first quality F.R.P |
|
|
|
|
| |
door and shutter with handles, hinges |
|
|
|
|
| |
& Tower bolts including cost of fixing |
|
|
|
|
| |
charge, cost of conveyance, etc. complete |
|
|
|
|
| |
as per standard practice. |
|
|
|
|
45 |
GYPSUM CEILING |
743 |
M2 |
|
|
| |
Supplying and fixing false ceiling using |
|
|
|
|
| |
Gypsum board or equilent ar per architect |
|
|
|
|
| |
design to line and level fixed on to power |
|
|
|
|
| |
coated aluminum sections of approved |
|
|
|
|
| |
make as per standard practice including |
|
|
|
|
| |
cost and conveyance of all materials to site |
|
|
|
|
| |
scaffolding handling and all labour charges |
|
|
|
|
| |
complete |
|
|
|
|
46 |
PAINTING EXTERIOR WALLS |
|
|
|
|
| |
Providing and applying 2 coats of exterior |
|
|
|
|
| |
emulsion of approved colors to external |
|
|
|
|
| |
surface of walls after proper preparation of |
|
|
|
|
| |
the surface including cleaning the surface |
|
|
|
|
| |
of dirt,grease,wax etc and applying two |
|
|
|
|
| |
coats of paint primer including cost |
|
|
|
|
| |
conveyance lead and lift of all materials to |
|
|
|
|
| |
site,ire and labour charges for scaffoldings |
|
|
|
|
| |
etc complete. |
|
|
|
|
a |
(Including two coats of external putty |
1520 |
M2 |
|
|
| |
finish to level the dents and make the |
|
|
|
|
| |
surface uniform to perfect and smooth |
|
|
|
|
| |
finish to employers satisfaction |
|
|
|
|
b |
Basement area |
56 |
M2 |
|
|
47 |
PAINTING INTERIOR WALLS |
2217 |
M2 |
|
|
| |
Providing and applying 2 coats of interior |
|
|
|
|
| |
emulsion to all plastered surface such as |
|
|
|
|
| |
internal walls, columns, beams etc after |
|
|
|
|
| |
proper preparation of the surface including |
|
|
|
|
| |
cleaning the surface and applying two |
|
|
|
|
| |
coats of paint primer including cost of |
|
|
|
|
| |
conveyances, lead and lift of all materials |
|
|
|
|
| |
to site, labor charges and hire etc complete |
|
|
|
|
| |
|
|
|
|
|
| |
(Including two coats of putty finish to level |
|
|
|
|
| |
the dents and make the surface uniform to |
|
|
|
|
| |
perfect and smooth finish to employers |
|
|
|
|
| |
satisfaction) |
|
|
|
|
48 |
PAINTING ALL WOODEN WORKS BY |
|
|
|
|
| |
polishing using two coats of M.R.F. |
|
|
|
|
| |
polyurethane spray polishing matt finish |
|
|
|
|
| |
after proper preparation of the surface as |
|
|
|
|
| |
specified of the surface of wood by |
|
|
|
|
| |
rubbing using sand paper and filler and |
|
|
|
|
| |
sealer and strainer coats to teak wood |
|
|
|
|
| |
finish as per standard practice including |
|
|
|
|
| |
painting the M.S grills of windows and |
|
|
|
|
| |
ventilators using two coats of synthetic |
|
|
|
|
| |
enamel black colour matt finish over two |
|
|
|
|
| |
coat of zinc chromite after proper |
|
|
|
|
| |
preparation of the surface to the employers |
|
|
|
|
| |
satisfaction for existing windows, doors |
|
|
|
|
| |
and ventilators. |
|
|
|
|
a |
DSWS4S 370 X 210 |
1 |
|
No |
|
b |
DKW4 370 X 210 |
1 |
|
|
|
c |
D1W1 140 X 210 |
22 |
|
|
|
d |
D 110 X 210 |
6 |
|
|
|
e |
DS 170 X 210 |
4 |
|
|
|
f |
DSW4 310 X 210 |
20 |
|
|
|
g |
W4 200 X 135 |
4 |
|
|
|
h |
W3 150 X 135 |
1 |
|
|
|
i |
D1 90 X 210 |
1 |
|
|
|
j |
V2 100 X 60 |
22 |
|
|
|
k |
V1 60 X 60 |
1 |
|
|
|
49 |
NCL STRUCTURAL GLAZING |
51 |
M2 |
|
|
| |
systems are superior to that of |
|
|
|
|
| |
conventional Aluminum structural glazing |
|
|
|
|
| |
since it uses Steel sections which have far |
|
|
|
|
|
| |
more strength than equivalent Aluminum |
|
|
|
|
| |
sections. NCL Structural Glazing is |
|
|
|
|
| |
fabricated from Roll formed sections made |
|
|
|
|
| |
of galvanized Steel colour coated/Powder |
|
|
|
|
| |
coated (Base steel as per IS 513 of 'D' |
|
|
|
|
| |
quality, galvanized as per IS 277 with Zinc |
|
|
|
|
| |
of 120 Gms/Sq.mtr.) with total coated |
|
|
|
|
| |
thickness of 0.8mm for verticals and |
|
|
|
|
| |
0.66mm for horizontals. The glass is held at |
|
|
|
|
| |
the top & bottom by a mechanical holding |
|
|
|
|
| |
system whose section is made of 304 grade |
|
|
|
|
| |
stainless steel of 0.6mm thick. |
|
|
|
|
|
| |
Conventional Aluminum uses weather |
|
|
|
|
| |
sealant as the glass holder which can get |
|
|
|
|
| |
weaker as time pass by. Galvanized steel |
|
|
|
|
| |
sections are used as stiffeners inside the |
|
|
|
|
| |
colour coated Steel/powder coated sections |
|
|
|
|
| |
as per the design requirement. Design |
|
|
|
|
| |
calculations are made to suit wind |
|
|
|
|
| |
pressures as given in IS 875. |
|
|
|
|
50 |
Water proofing Water Tanks, R.C.C |
94 |
M2 |
|
|
| |
sunken slab and where ever necessary |
|
|
|
|
| |
using slab and where ever necessary |
|
|
|
|
| |
using Water proofing compound of |
|
|
|
|
| |
Approved make (Roff, |
|
|
|
|
| |
Cera,Dr.Fixit,Fosroc etc. as per companys |
|
|
|
|
| |
specification after pressure grouting for |
|
|
|
|
| |
perfect water proof finish using skilled |
|
|
|
|
| |
labour providing life long Guarantee for |
|
|
|
|
| |
the work including cost of conveyance |
|
|
|
|
| |
Labour charges, Scaffolding charges lead |
|
|
|
|
| |
and lift etc. complete. |
|
|
|
|
51 |
Anti Terminate proofing |
LS |
|
|
|
52 |
CORNICE WORK |
|
|
|
|
a |
Round columns |
12 |
No |
|
|
b |
Edge portions of RCC slab |
252 |
M |
|
|
53 |
Electrification |
LS |
|
|
|
54 |
Water supply & sanitary fitting |
LS |
|
|
|
55 |
Unroreseen items |
|
|
|
|
GRAND TOTAL |